-The kitchen, family room, and downstairs bathroom were completed in June of 2013
-The hardwood floor was installed in family room kitchen hallways in 2013
-The upstairs carpet was replaced in2014.
-The closets in the master bedroom and the two children’s bedrooms were updated 2014.
-Main upstairs bathroom and master bathroom updated 2014
-Outside deck replaced 2019
-Furnace, air conditioner, hot water heater replaced with renovation Generac generator 2010